Re: 1928 driveshaft diameter

Posted by Marty or Marston On 2019/7/1 12:58:52
I should have mentioned that I had parts from several drive shafts. I was going to have a good one made up from them, which would have involved cutting and welding the parts together. I could not find a local source that had ability to balance the shaft afterwards without fabricating flanges for their machine. The cost of making these flanges with the cost of welding a shaft from the parts was very close to the cost of a new shaft with modern components, which was ~$675.00).

Also, the company I used was the one mentioned by Tom in post #4. BTW - I was very pleased by the support and service I received from them.

This Post was from: https://packardinfo.com/xoops/html/modules/newbb/viewtopic.php?post_id=213009