Thanks guys. Tx. Pictures above would be the same as what I would post now. I will look to make some adjustments based on this input. At this rate. I would pay Steel if they would vulcanize!
Got some other smaller things done
Put in an Accelerator boot. Bought it from Max.
Installed pedals, carpet and seat.
Was able to get the Heater shut off valve off. Took a little work but got it. New one should be here early this week. Went with the NAPA recommendation.
Had to order the fitting for the fuel Line that routes it through the frame. You can see the threads got a little beat up! Thanks to lead from Big Kev! Joel Ray had another one and that too should be here Monday. Then I will be able to see if she can start!
This Post was from: https://packardinfo.com/xoops/html/modules/newbb/viewtopic.php?post_id=270561