Re: 1948 NYC lwb taxi project

Posted by packardtaximan On 2020/6/19 15:11:23
Little progress to show but a lot of sorting, cleaning, and polishing. I do have all 4 matching wheels and tires done, My most recent accomplishment was the dash assembly. The biggest hurdle was to locate all of the different screws to hold everything together. I also located, cleaned and painted all of the brackets to mount the bumpers. next plan is to sort all of the front splash pans and detail them. I did learn that there is a specific order in which the dash parts must be assembled. There was much trial and error in the process. I need to take a couple of days to re-group and organize the shop and take a break from the project. Stay tuned and thanks for your interest. pictures to follow (maybe)

This Post was from: https://packardinfo.com/xoops/html/modules/newbb/viewtopic.php?post_id=223605