We are starting on the steel prototype headers this AM.
First step was to remove the PVC mockup headers.
Here are those mockups on the floor.
For my part, I'm working on modifying the flanges. No digipix yet.
Craig
P.S. At 9AM it was 90F. We quit then as the "thermal cutoff switch" kicked in. Man, I'll be glad when Summer is over!
This Post was from: https://packardinfo.com/xoops/html/modules/newbb/viewtopic.php?post_id=129514