Re: Meticulous 55 Convertible Resto

Posted by BigKev On 2023/6/6 10:04:57
It looks like none of the interior has been started or ordered. So there is 10-15k additional right there.

The work that has been done looks very nice, if not too good when compared to how it originally left East Grand Ave.

This Post was from: https://packardinfo.com/xoops/html/modules/newbb/viewtopic.php?post_id=257738