Re: Packard Hydro-E System

Posted by David Childs On 2013/1/8 17:04:20
Update on hydro-e System project: Thanks to the input from everyone I am ready to begin installation of the new hoses. (Thanks, Steele & Hydro-E-Lectric). I thought I would have a problem inserting the new hose end with the yellow collar into the new conduit. Hydro-E has assured me that trimming that yellow collar away will not compromise anything to do with the hose. My plans are to begin working on one door at a time, install cylinder/frame, hoses, window glass, and then switch. Finish one door and go to the next so as to not completely forget where I left off. When all four doors are back together it will be time to test the pump part of the project and adjust the up-down movement of the glass. More to come soon.

Attach file:



jpg  (56.88 KB)
3440_50ec9745c4fbd.jpg 1024X768 px

jpg  (45.55 KB)
3440_50ec975a492a4.jpg 1024X768 px

jpg  (28.22 KB)
3440_50ec97700cd7c.jpg 1024X768 px

This Post was from: https://packardinfo.com/xoops/html/modules/newbb/viewtopic.php?post_id=115566