Re: tires 51 "300"

Posted by fredkanter On 2016/9/15 17:39:39
If they advertise 3" and you ordered 3" they should measure 3". This is not like a 2"x4" piece of lumber which is understood to be the size pre-cutting.

If you got 2 5/8" the company should take them back at their cost. Try sending them a check for $300 and gave it read $258.

This Post was from: https://packardinfo.com/xoops/html/modules/newbb/viewtopic.php?post_id=181924