Re: Conner ave plant

Posted by HH56 On 2017/3/16 12:08:21
If the demolition only took a month or so for the entire plant, apparently that "massive block of concrete" some books reported as being too large an obstacle to overcome resulting in a break in the assembly line and the need for manual moving of cars around it wasn't so massive after all.

This Post was from: https://packardinfo.com/xoops/html/modules/newbb/viewtopic.php?post_id=189265